h17 condominium
- July 1, 2023
Consideration and assimilation of existing building values in a vision
Read more- July 1, 2023
Consideration and assimilation of existing building values in a vision
Read more- August 2, 2022
Cutting-edge hybrid office addressing post-COVID organizational challenges
Read more- July 30, 2022
BIM-based design and project management for a leading steel structure manufacturer and contractor
Read more- July 29, 2022
We were involved in the interior design of two buildings of the Budapest Congress and Exhibition Center.
Read more- July 28, 2022
A digital twin of the ZenGarden office building is an advantage for further planning, operation, and meeting tenant needs.
Read more- July 27, 2022
Interior design of Agora private clinic. Medical technology planning covered 14 rooms with special needs.
Read more- July 26, 2022
As part of an investment of more than €30 million for Continental, one of the world's leading automotive companies, we designed a complete site of 30 100 m2 in 5 phases over 5 years using BIM methodology.
Read more- July 24, 2022
Robert Bosch Ltd. planned to redevelop office and laboratory space in its existing properties and existing leaseholds. The customer engaged our office as a professional partner for the preparation of the design plans for the conversion works to be carried out and, following the selection of the contractors, for the execution of the works and the handover.
Read more- July 20, 2022
The aim was to renovate the prestigious Gerevich Aladár National Sports Hall, which is also important for the history of sport. The interior design was carried out using BIM methodology, based on a laser survey of the site.
Read more- July 8, 2022
As one of our projects with extremely short deadlines, we had only 4 days to prepare a full concept plan.
Read more- July 7, 2022
Due to the specific technological requirements, the project was characterized by complex technical solutions and a high level of interdisciplinary cooperation.
Read more- July 6, 2022
The general design of a zero-energy, hi-tech coworking office using the closed-BIM methodology.
Read more- July 5, 2022
In the summer of 2020, we were commissioned to develop a space plan and design concept for a downtown office […]
Read more