

Tüskecsarnok lighting bridge
- September 17, 2023
Due to the high ceiling height, safety risks, tight schedule, and construction conditions, a rigorous and flawless schedule was required.
Read more

- September 17, 2023
Due to the high ceiling height, safety risks, tight schedule, and construction conditions, a rigorous and flawless schedule was required.
Read more

- July 20, 2022
General design of a two-pool swimming pool for the Sárospatak Reformed College Grammar School in a nature conservation area of local importance.
Read more

- July 7, 2022
Due to the specific technological requirements, the project was characterized by complex technical solutions and a high level of interdisciplinary cooperation.
Read more

- July 6, 2022
The aim was to renovate the prestigious Gerevich Aladár National Sports Hall, which is also important for the history of sport. The interior design was carried out using BIM methodology, based on a laser survey of the site.
Read more- August 10, 2021
We have a lot of projects, and we're moving relatively slowly with uploading them to the site—we apologize, but in the meantime, we're happy to answer any questions or respond to any inquiries!
Read more