The project

The West End Business Center is a three-wing office building developed in several phases along Budapest’s Váci Road office corridor. The refurbishment initially focused on the main reception and communal areas used by EY, then expanded during the design process to include additional parts of the building and further functions.

Due to the tight design schedule, BuildEXT developed a comprehensive digital model of the entire building during the concept design phase. This made it possible to integrate newly commissioned design tasks into the same coordinated design environment. The initial scope covering three reception areas, the adjoining staircases and a conference room was later extended to include a cloakroom, catering area, baby care room, yoga room, mechanical areas, washrooms and the redevelopment of the internal courtyard.

The project aimed to modernise the building’s communal, tenant and related service areas, while coordinating the architectural, interior design, mechanical and electrical upgrades. The design also had to take into account BREEAM Excellent and ACCESS4YOU certification requirements, as well as OTP Real Estate’s corporate identity guidelines.

West End Business Center felújítás render

Design scope

  • concept and redesign of the main lobbies, lift lobbies and staircases, with a coordinated visual identity;
  • façade refurbishment, entrance areas, canopies, doors and windows, and signage;
  • architectural and interior design of the HUB, Innovation Lab, conference, catering, cloakroom, baby care, yoga and related service areas;
  • redesign of the internal courtyard with furniture, bicycle storage and other covered storage facilities;
  • coordination of the modernisation and design of mechanical, electrical, BMS, low-voltage, AV, access control, CCTV and fire alarm systems;
  • integration of technical, material, lighting and accessibility requirements related to BREEAM Excellent and ACCESS4YOU targets.
  • general design coordination of EY’s office, communal and related service areas;

During the West End Business Center refurbishment, the renewal of common and tenant areas had to be coordinated with building-wide modernisation requirements. For the façade and external lighting, energy efficiency, reduction of light pollution, durable and easy-to-maintain materials, and improvement of the building’s urban appearance were also key design considerations.

Team

BuildEXT
Lead Architect: Csaba Livják
Project Lead Architect: Zsófia Németh
Architectural Design Team: Kornél Győri, Kornélia Kenyeres, Katalin Tóth
Electrical Design Team: Tamás Domonics, Ottó Nemesvári
BIM Manager: András Ábele-Nagy

External disciplines
Mechanical Design Team: Tibor Pásztor, Gyula Kovács
Structural Engineer: Péter Markovits
Fire Protection Designer: György Báder

Photos & CGI
BuildEXT

Sandor Nagy

Talk to Sándor about this project
Sandor Nagy

Business manager

+36 30 953 8212

Get in touch