{"id":5132,"date":"2026-03-26T00:00:00","date_gmt":"2026-03-26T00:00:00","guid":{"rendered":"http:\/\/217.144.56.49\/~buildext\/projektek\/continental-site\/"},"modified":"2026-04-01T08:51:25","modified_gmt":"2026-04-01T08:51:25","slug":"continental-site-budapest","status":"publish","type":"projects","link":"https:\/\/buildext.com\/en\/projects\/continental-site-budapest\/","title":{"rendered":"Continental site"},"content":{"rendered":"<p class='client'>Client: <b>Continental Automotive Hungary Ltd.<\/b><p class='size'>Size: <b>30 100 m2<\/b><p class='location'>Location: <b>Budapest<\/b><p class='completion'>Completion: <b>2020<\/b><p class='architect'>Architect: <b>S\u00e1ndor Nagy<\/b><p class='awards'>Awards: <b>Ipar 4.0 mintagy\u00e1r<\/b><p class='services'>Services: <a href=\"https:\/\/buildext.com\/en\/services\/architectural-design\/\" rel=\"tag\">Architectural design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/bim-services\/\" rel=\"tag\">BIM services<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/general-design\/\" rel=\"tag\">General design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/interior-design\/\" rel=\"tag\">Interior design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/project-management\/\" rel=\"tag\">Project management<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/scan-to-bim-eng\/\" rel=\"tag\">Scan to BIM<\/a><p class='sectors'>Sectors: <a href=\"https:\/\/buildext.com\/en\/sectors\/industrial-building\/\" rel=\"tag\">Industrial building<\/a>, <a href=\"https:\/\/buildext.com\/en\/sectors\/office\/\" rel=\"tag\">Office<\/a>\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-video alignfull\"><video height=\"1080\" style=\"aspect-ratio: 1920 \/ 1080;\" width=\"1920\" controls=\"\" poster=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/projects-continental-budapest-3840_2160-scaled.jpg\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Continental-video-01.mp4\"><\/video><\/figure>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">The joy of a technical challenge<\/h2>\n\n<p>We are planning a complete site development of 30 100 m2 in 5 phases over 5 years for Continental, one of the world&#8217;s leading automotive companies. The assignment was particularly exciting for us because the expansion of an industrial facility with complex systems is an excellent opportunity to take advantage of the <a href=\"https:\/\/buildext.com\/en\/bim\/\" target=\"_blank\" data-type=\"page\" data-id=\"14333\" rel=\"noreferrer noopener\">BIM-based working method<\/a> we use.<\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-cover is-light offset-text-left\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-0 has-background-dim\"><\/span><img decoding=\"async\" width=\"2560\" height=\"1707\" class=\"wp-block-cover__image-background wp-image-4383\" alt=\"continental tet\u0151szerkezet\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-05-scaled.jpg\" style=\"object-position:52% 29%\" data-object-fit=\"cover\" data-object-position=\"52% 29%\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-05-scaled.jpg 2560w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-05-300x200.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-05-1920x1280.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-05-768x512.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-05-1536x1024.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-05-2048x1365.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<p class=\"cover-mobile-p has-white-color has-black-background-color has-text-color has-background has-large-font-size\"><strong>The technological complexity of industrial buildings becomes manageable with BIM.<\/strong><\/p>\n<\/div><\/div>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h4 class=\"wp-block-heading pb-0\">Continental as a customer<\/h4>\n\n<p class=\"pt-0\"><a href=\"https:\/\/www.continental.com\/hu-hu\/vallalat\/continental-vallalatok-magyarorszagon\/budapest\/\" target=\"_blank\" rel=\"noreferrer noopener\">Continental\u2019s Budapest plant<\/a> manufactures automotive electronics products for the world\u2019s leading automotive manufacturers, applying highly advanced and innovative technologies in almost all areas of automotive electronics. The Budapest plant focuses on the production of key systems for self-driving, electrically powered and internet-connected vehicles, such as electric control units, drive systems, mechatronic systems, displays, infotainment systems.<\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-create-block-buildext-slider-block alignfull slider owl-carousel auto-width owl-theme\"><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4402\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_01.jpg\" alt=\"Aerial view from north-west of the container groups K1,K2 to be demolished\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_01.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_01-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_01-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_01-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Aerial view from north-west of the container groups K1,K2 to be demolished<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4404\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_02.jpg\" alt=\"Aerial photo of production halls F1 and under construction F2 and F3\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_02.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_02-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_02-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_02-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Aerial photo of production halls F1 and under construction F2 and F3<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4406\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_03.jpg\" alt=\"Aerial photo of the F2 production hall under construction\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_03.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_03-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_03-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_03-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Aerial photo of the F2 production hall under construction<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4408\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_04.jpg\" alt=\"Aerial photo of the head building E\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_04.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_04-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_04-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-aerial_04-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Aerial photo of the head building E<\/span><\/div><\/div>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Survey<\/h2>\n\n<h4 class=\"wp-block-heading pb-0\">Scan to BIM at industrial scale<\/h4>\n\n<p class=\"pt-0\">The quality of architectural work is greatly influenced by the data available. This is particularly true in the case of a renovation or extension. That&#8217;s why we are happy to rely on the expertise of our in-house scanning team. In this case too, we recorded a <a href=\"https:\/\/buildext.com\/en\/what-is-scan-to-bim\/\" target=\"_blank\" data-type=\"post\" data-id=\"14744\" rel=\"noreferrer noopener\">point cloud based on a laser scan<\/a> of the entire site. This is the centimetre-accurate data set that we used to build the building information model (<a href=\"https:\/\/buildext.com\/en\/bim\/\" data-type=\"page\" data-id=\"14333\">BIM<\/a>) on which the design is based.<\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-create-block-buildext-slider-block alignfull slider owl-carousel auto-width owl-theme\"><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4450\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-05_2.jpg\" alt=\"scan\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-05_2.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-05_2-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-05_2-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-05_2-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>scan<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4448\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-05.jpg\" alt=\"BIM\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-05.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-05-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-05-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-05-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>BIM<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4446\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-04_2.jpg\" alt=\"scan\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-04_2.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-04_2-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-04_2-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-04_2-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>scan<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4444\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-04.jpg\" alt=\"BIM\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-04.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-04-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-04-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-04-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>BIM<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4442\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-03_2.jpg\" alt=\"scan\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-03_2.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-03_2-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-03_2-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-03_2-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>scan<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4440\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-03.jpg\" alt=\"BIM\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-03.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-03-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-03-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-03-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>BIM<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4438\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-02_2.jpg\" alt=\"scan\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-02_2.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-02_2-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-02_2-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-02_2-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>scan<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4436\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-02.jpg\" alt=\"BIM\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-02.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-02-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-02-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-02-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>BIM<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4434\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-01-2.jpg\" alt=\"scan\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-01-2.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-01-2-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-01-2-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-01-2-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>scan<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-4432\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-01.jpg\" alt=\"BIM\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-01.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-01-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-01-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continetal-scantobim-01-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>BIM<\/span><\/div><\/div>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Working in a common data environment<\/h2>\n\n<h4 class=\"wp-block-heading pb-0\">CDE is the basis for smooth communication<\/h4>\n\n<p class=\"pt-0\">As an architect, coordinating the client, the contractor and the designers is always a challenge. This was particularly true in this particular case, where the project had to comply with precisely standardised industry standards, while the conversion was divided into five phases in terms of time and space. We were able to successfully coordinate the processes because the data created in a closed BIM system was stored and shared with all participants in a <a href=\"https:\/\/buildext.com\/en\/what-is-bep-eir-cde\/#cde\" target=\"_blank\" data-type=\"post\" data-id=\"3967\" rel=\"noreferrer noopener\">cloud-based shared data environment<\/a>.  <\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-create-block-buildext-slider-block alignfull slider owl-carousel auto-width owl-theme\"><div><img decoding=\"async\" width=\"2560\" height=\"1350\" class=\"wp-image-4467\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-03-scaled.jpg\" alt=\"Detail drawing with mechanical systems - F1, F2, F3 \" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-03-scaled.jpg 2560w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-03-300x158.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-03-1920x1012.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-03-768x405.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-03-1536x810.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-03-2048x1080.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><span>Detail drawing with mechanical systems &#8211; F1, F2, F3 <\/span><\/div><div><img decoding=\"async\" width=\"2560\" height=\"1350\" class=\"wp-image-4465\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-02-scaled.jpg\" alt=\"Detail drawing with mechanical systems - F1, F2, F3\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-02-scaled.jpg 2560w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-02-300x158.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-02-1920x1012.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-02-768x405.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-02-1536x810.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-02-2048x1080.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><span>Detail drawing with mechanical systems &#8211; F1, F2, F3<\/span><\/div><div><img decoding=\"async\" width=\"2560\" height=\"1350\" class=\"wp-image-4463\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-01-scaled.jpg\" alt=\"Detail drawing with mechanical systems - F1, F2, F3\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-01-scaled.jpg 2560w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-01-300x158.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-01-1920x1012.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-01-768x405.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-01-1536x810.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-exploded-01-2048x1080.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><span>Detail drawing with mechanical systems &#8211; F1, F2, F3<\/span><\/div><div><img decoding=\"async\" width=\"2560\" height=\"1350\" class=\"wp-image-4469\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-image-02-scaled.jpg\" alt=\"Detail drawing with mechanical systems - F1, F2, F3\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-image-02-scaled.jpg 2560w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-image-02-300x158.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-image-02-1920x1012.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-image-02-768x405.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-image-02-1536x810.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/continental-image-02-2048x1080.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><span>Detail drawing with mechanical systems &#8211; F1, F2, F3<\/span><\/div><\/div>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>With our help, the Continental site has started its journey through its own <a href=\"https:\/\/buildext.com\/en\/bim\/#bim-digitalis-eletciklus\" data-type=\"link\" data-id=\"https:\/\/buildext.com\/bim\/#bim-digitalis-eletciklus\">BIM lifecycle<\/a>. This will make all future modifications, conversions and operational challenges easier and faster. The building information model created from the site will serve the client&#8217;s interests in the long term and provide them with the opportunity to increase efficiency.  <\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n<div class=\"wp-block-group alignwide is-layout-flow wp-block-group-is-layout-flow\">\n<h2 class=\"wp-block-heading alignwide has-text-align-center pb-0\">Interested in our BIM services?<\/h2>\n\n\n\n<p class=\"has-text-align-center pt-0\">Learn more about our BIM based services!<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons alignwide is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-white-color has-black-background-color has-text-color has-background wp-element-button\" href=\"https:\/\/buildext.com\/en\/bim-services\/\" style=\"border-radius:0px\" target=\"_blank\" rel=\"noreferrer noopener\">BIM services<\/a><\/div>\n<\/div>\n<\/div>\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Representative interior<\/h2>\n\n<p>In addition to the engineering challenges of complex industrial solutions, we were proud that our interior design team was also given an important role in the development plans for the headquarters. We had to design high quality office and community spaces to meet representative needs. And perhaps the most exciting part of the project was the design of a meeting room and associated roof terrace in a steel-framed glass-fronted cube on the upper level of the headquarters.   <\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-create-block-buildext-slider-block alignfull slider owl-carousel auto-width owl-theme\"><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-5284\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-lobby-01.jpg\" alt=\"Lobby\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-lobby-01.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-lobby-01-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-lobby-01-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-lobby-01-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Lobby<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-5286\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-01.jpg\" alt=\"Representative meeting room\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-01.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-01-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-01-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-01-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Representative meeting room<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-5288\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-02.jpg\" alt=\"Representative meeting room\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-02.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-02-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-02-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-02-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Representative meeting room<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-5290\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-03.jpg\" alt=\"Representative meeting room\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-03.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-03-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-03-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-meeting-03-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Representative meeting room<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-5292\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-terrace-01.jpg\" alt=\"Green roof\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-terrace-01.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-terrace-01-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-terrace-01-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/continental-interior-terrace-01-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Green roof<\/span><\/div><\/div>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>The Continental site development project is particularly appealing to us because our office&#8217;s wide-ranging knowledge and open approach to technological innovation are perfectly suited to the challenges of the task. <\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image alignfull size-large\"><img decoding=\"async\" width=\"1920\" height=\"1013\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-03-1920x1013.jpg\" alt=\"\" class=\"wp-image-4394\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-03-1920x1013.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-03-300x158.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-03-768x405.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-03-1536x810.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/continental-image-03-2048x1080.jpg 2048w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Continental site<\/h2>\n\n<h3 class=\"wp-block-heading\">Team<\/h3>\n\n<p><strong>BuildEXT<\/strong> <br\/>Architect: S\u00e1ndor Nagy<br\/>Architectural designers: Kardos S\u00e1ndor, Miljanovis K\u00edra, R\u00f3zsa P\u00e9ter, Soms\u00e1k Tam\u00e1s, Varga J\u00e1nos, Zeng\u0151 Attila, Goda Levente<br\/><br\/><strong>Partners<\/strong><br\/>Schmidt Barna, Krieger Bal\u00e1zs, Szab\u00f3n\u00e9 M\u00e9sz\u00e1ros Andrea Katalin<br\/><br\/><strong>Photo &amp; CGI<\/strong><br\/>BuildEXT <\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>As part of an investment of more than \u20ac30 million for Continental, one of the world&#8217;s leading automotive companies, we designed a complete site of 30 100 m2 in 5 phases over 5 years using BIM methodology.<\/p>\n","protected":false},"author":8,"featured_media":5118,"template":"","meta":{"content-type":"","project_subtitle":"5 years, 5 phases. Complete factory development<br>for one of the world's leading automotive companies. ","project_client":"Continental Automotive Hungary Ltd.","project_size":"30 100 m2","project_location":"Budapest","project_completion":"2020","project_year_of_design":"","project_architect":"S\u00e1ndor Nagy","project_interior_designer":"","project_awards":"Ipar 4.0 mintagy\u00e1r","project_certification":"","project_featured":"true","project_featured_image_portrait":"5318","footnotes":""},"services":[305,292,293,291,289,290],"sectors":[299,302],"class_list":["post-5132","projects","type-projects","status-publish","has-post-thumbnail","hentry","services-architectural-design","services-bim-services","services-general-design","services-interior-design","services-project-management","services-scan-to-bim-eng","sectors-industrial-building","sectors-office"],"_links":{"self":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/5132","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/users\/8"}],"version-history":[{"count":31,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/5132\/revisions"}],"predecessor-version":[{"id":18315,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/5132\/revisions\/18315"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media\/5118"}],"wp:attachment":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media?parent=5132"}],"wp:term":[{"taxonomy":"services","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/services?post=5132"},{"taxonomy":"sectors","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/sectors?post=5132"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}