{"id":18229,"date":"2023-07-03T13:53:02","date_gmt":"2023-07-03T13:53:02","guid":{"rendered":"https:\/\/buildext.com\/projektek\/lemo\/"},"modified":"2026-04-13T14:39:32","modified_gmt":"2026-04-13T14:39:32","slug":"elektronikai-alkatreszgyarto-uzem-iroda-fejlesztes","status":"publish","type":"projects","link":"https:\/\/buildext.com\/en\/projects\/elektronikai-alkatreszgyarto-uzem-iroda-fejlesztes\/","title":{"rendered":"Electronics component manufacturing plant and office development"},"content":{"rendered":"<p class='client'>Client: <b>Swiss-owned multinational company<\/b><p class='size'>Size: <b>12 400 + 9000 m2<\/b><p class='location'>Location: <b>Budapest<\/b><p class='architect'>Architect: <b>Attila T\u00f3th<\/b><p class='interior-designer'>Interior designer: <b>D\u00e1vid Cserh\u00e1ti<\/b><p class='services'>Services: <a href=\"https:\/\/buildext.com\/en\/services\/bim-services\/\" rel=\"tag\">BIM services<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/concept-design\/\" rel=\"tag\">Concept design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/general-design\/\" rel=\"tag\">General design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/interior-design\/\" rel=\"tag\">Interior design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/scan-to-bim-eng\/\" rel=\"tag\">Scan to BIM<\/a><p class='sectors'>Sectors: <a href=\"https:\/\/buildext.com\/en\/sectors\/industrial-building\/\" rel=\"tag\">Industrial building<\/a>, <a href=\"https:\/\/buildext.com\/en\/sectors\/office\/\" rel=\"tag\">Office<\/a>\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"LEMO Budapest | Ipari \u00e9p\u00edt\u00e9szet, BIM \u00e9s design \u2013 koncepci\u00f3\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/zP1QznVhDyE?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">The project<\/h2>\n\n<p>A Swiss-owned multinational electronics group planned to expand its manufacturing capacity in Hungary in two phases with a newly built electronics component manufacturing plant at its Budapest site, for which it was looking for a general designer.<\/p>\n\n<ol class=\"wp-block-list\">\n<li><strong>Phase<\/strong>: 10,000 m2, single-story industrial building and 2,400 m2 net two-story office building (2026)<\/li>\n\n\n\n<li><strong>Phase<\/strong>: 9,000 m2 two-story factory building (2040)<\/li>\n<\/ol>\n\n<p>In the medium term, while the second phase is not yet underway, part of the investment will involve the creation of a paid parking area on the available land.<\/p>\n\n<p>BuildEXT won the tender for the general design tasks, allowing the collaboration to begin in March 2024.<\/p>\n\n<div class=\"wp-block-group has-background is-layout-constrained wp-block-group-is-layout-constrained\" style=\"border-width:1px;background-color:#f9f9f9\">\n<p>The Swiss-based company manufactures electronic components, primarily industrial connectors and cables. It has manufacturing facilities in many countries around the world and serves approximately 100,000 customers in 80 countries with 75,000 different products.<\/p>\n\n\n\n<p>It has been operating in Hungary since 1990, employing approximately 120 people in an integrated infrastructure ranging from machining to cable assembly and sales, manufacturing push-pull connectors for customers such as <strong>Siemens<\/strong>, <strong>Audi Hung\u00e1ria<\/strong>, and <strong>NBH<\/strong>.<\/p>\n<\/div>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Initial condition<\/h2>\n\n<p>The planned location for the company&#8217;s new site is the former Pesterzs\u00e9bet Paper Mill property. The technical condition of the existing buildings in the rust belt area has deteriorated overall and cannot be renovated economically. The developer therefore decided to demolish the buildings and grind up the large amount of reinforced concrete on site, reusing it during construction and, in part, as paving for the rental parking area.  <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1280\" height=\"594\" data-id=\"17739\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/Lemo-Google-Earth-telephely-2-1280-1.jpg\" alt=\"Electronics component manufacturing plant site and the former Pesterzs&#xE9;bet Paper Mill, which is being demolished (Source: Google Earth)\" class=\"wp-image-17739\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/Lemo-Google-Earth-telephely-2-1280-1.jpg 1280w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/Lemo-Google-Earth-telephely-2-1280-1-300x139.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/Lemo-Google-Earth-telephely-2-1280-1-768x356.jpg 768w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><figcaption class=\"wp-element-caption\">The site and the buildings to be demolished (Source: Google Earth)<\/figcaption><\/figure>\n<\/figure>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\">Scan to BIM<\/h3>\n\n<p>In order to ensure a smooth demolition process and precise planning, we began the project with a drone-mounted laser survey. The purpose of recording the initial condition was also to plan the entire investment in such a way as to save as many trees as possible. <\/p>\n\n<figure class=\"wp-block-image alignwide size-full\"><img decoding=\"async\" width=\"1080\" height=\"617\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephely-laserscan.png\" alt=\"\" class=\"wp-image-17731\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephely-laserscan.png 1080w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephely-laserscan-300x171.png 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephely-laserscan-768x439.png 768w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><figcaption class=\"wp-element-caption\">We measured the existing condition using a drone-mounted laser (Source: BuildEXT)<\/figcaption><\/figure>\n\n<p>As can be seen in the visual plans below, the staff canteen, the terrace opening from it, and most of the office areas will also overlook the area with mature trees.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Attractive expectations<\/h2>\n\n<p>We had to meet a number of the client\u2019s requirements for the building, which mainly focused on exceptionally <strong>high employee comfort<\/strong>, the integration of <strong>hi-tech manufacturing technology<\/strong>, <strong>environmental considerations<\/strong>, and <strong>economical operation<\/strong>.<\/p>\n\n<p>Of course, <strong>aesthetic <\/strong> requirements also came into play: we had to design the connection between the halls of the first and second phases in such a way that it would appear natural from an architectural point of view, but the first phase alone would also have to look good. This was accompanied by the need for high-quality contemporary architectural design and a cost-effective yet highly attractive exterior and interior appearance. <\/p>\n\n<p>There was also a requirement that the first phase should take into account the goods traffic, utility connections, etc. of the second phase, and that the second phase should not significantly interfere with the production activities of the plant built in the first phase.<\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-create-block-buildext-cover-block alignfull offset-text-right cover\" style=\"min-height:986px\"><div class=\"desktop\" style=\"background-image:url(https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-13-birds-view-1920.jpg)\"><\/div><div class=\"mobile\" style=\"background-image:url(https:\/\/buildext.com\/wp-content\/uploads\/2023\/09\/tplus.png)\"><\/div><div class=\"inner-container\">\n<div id=\"phase-1\" class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"has-white-color has-black-background-color has-text-color has-background has-link-color has-x-large-font-size wp-elements-b13903adb4bbc01f01ae3d2356700550\">Phase 1 \u2013 Production hall and connected office tower buildings<\/p>\n<\/div>\n<\/div><\/div>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>The operational areas of the first phase had to be prepared primarily for machining production technology and related activities. We sought to create the most natural and well-designed physical connection possible between the single-story production block and the two-story office building, resulting in the following three-part division. <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>1. Left tower <\/strong><\/h3>\n\n<p>The tower on the left primarily serves those working in production. <\/p>\n\n<p>They can approach the revolving door employee entrance from the large parking lot via a landscaped path equipped with bicycle storage, from where stairs lead up to the men&#8217;s and women&#8217;s changing rooms and the washrooms. There is also a cleaning equipment storage room and a mechanical room on this floor.  <\/p>\n\n<p>We placed a canteen with a heating kitchen on the ground floor, \u0171used by both office and factory workers. The facade of the office building is covered with aluminum curtain walls over its entire height, in front of which there is an expanded aluminum shading structure, which also gives the facade its characteristic architectural appearance. <\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-create-block-buildext-slider-block alignfull slider owl-carousel auto-width owl-theme\"><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-17572\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-02-left-tower-1920.jpg\" alt=\"The left tower was primarily designed for factory workers.\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-02-left-tower-1920.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-02-left-tower-1920-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-02-left-tower-1920-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-02-left-tower-1920-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>The left tower was primarily designed for factory workers.<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-17574\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-03-terrace-1920.jpg\" alt=\"\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-03-terrace-1920.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-03-terrace-1920-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-03-terrace-1920-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-03-terrace-1920-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-17624\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-03.jpg\" alt=\"\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-03.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-03-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-03-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-03-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/div><\/div>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\"><strong>Connecting bridge<\/strong><\/h3>\n\n<p>The section connecting the two towers houses office functions related to production.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-013.jpg\" alt=\"\" class=\"wp-image-17644\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-013.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-013-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-013-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-013-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n\n<p>The floor accessible from both staircases houses the offices for inventory preparation, logistics, and procurement, while the ground floor houses the offices related to production management. This area also houses the HR department, ensuring proximity for both employees and interviewees. <\/p>\n\n<p>The two large open-plan offices on the upper floor were separated by private meeting rooms, while also creating a direct connection to the finance and controlling departments located in the tower on the right.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Right tower<\/strong><\/h3>\n\n<p>The right tower is the most representative part of the building thanks to its spectacular main entrance.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image alignfull size-full\"><img decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-05-main-entrance-1920.jpg\" alt=\"\" class=\"wp-image-17578\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-05-main-entrance-1920.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-05-main-entrance-1920-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-05-main-entrance-1920-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-05-main-entrance-1920-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>On the ground floor, next to the reception and showroom, we have placed meeting rooms that also function as interview rooms. This area is used for receiving guests, recreation, and product presentations. It can accommodate more than 150 people, making it suitable for celebrations, training sessions, and company-level announcements. <\/p>\n\n<p>The upper floor reception area leads to the executive offices and the boardroom. From this level, you can access the upper part of the connecting bridge section leading to the left tower, as well as the bridge leading to the block to be built in phase 2. The server room, a bathroom, two smaller chat rooms, and a kitchenette are also located on this floor.   <\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-022.jpg\" alt=\"\" class=\"wp-image-17662\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-022.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-022-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-022-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-022-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><figcaption class=\"wp-element-caption\">The offices offer a direct view of the front garden, and stepping out into the corridor reveals the factory.<\/figcaption><\/figure>\n\n<h3 class=\"wp-block-heading\">Logistics functions<\/h3>\n\n<p>The warehouse is organized towards the planned second phase logistics yard, opening onto the south facade in phase 1 and the north facade in phase 2. The storage of finished products, packaging, preparation for transport, and the delivery gate are on the left, while the raw material storage and stockpiling are on the right. The raw materials warehouse can store bulk materials, palletized goods, and smaller parts thanks to lifting baskets. A scissor lift table on site helps to load side-loading trucks with a pallet jack.     <\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-12-backyard-1920.jpg\" alt=\"\" class=\"wp-image-17592\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-12-backyard-1920.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-12-backyard-1920-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-12-backyard-1920-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-12-backyard-1920-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n\n<h3 class=\"wp-block-heading\">Heating center, energy supply<\/h3>\n\n<p>We placed the building&#8217;s heating center in the middle of the production area, making sure that the noise from the compressor room would not disturb the surrounding residents, while at the same time ensuring that heat recovery would be possible due to the proximity of the heating center.<\/p>\n\n<p>The building&#8217;s transformer room and main distribution cabinet are also located at the center of the production area.<\/p>\n\n<p>Both buildings are equipped with leak and rainwater retention systems. The drainage reservoir in the front and rear gardens of the facility functions as a decorative pond with conscious use of plants, and we have designed a park around it to serve as a relaxation area for employees. <\/p>\n\n<h3 class=\"wp-block-heading\">Sustainability in the focus of building services engineering<\/h3>\n\n<p>During the design of the building services systems, we paid special attention to energy efficiency and the utilization of waste heat generated during production, which was also strongly supported by the client during the design process. The waste heat is used to raise the energy level of the liquid with a water-water heat pump, which supplies the entire heating demand of the office building and the air conditioning systems of the offices and the hall.  <\/p>\n\n<p>The waste heat from the compressor housing, which has a capacity of several hundred kilowatts, is used to heat the entire building, power ventilation systems, and supply hot water for domestic use. Thanks to the above, depending on the load (production ramp-up), the building&#8217;s heating requirements can be met entirely by utilizing waste heat. <\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-cover alignfull offset-text-right\" style=\"min-height:904px;aspect-ratio:unset;\" id=\"phase-2\"><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-block-cover__image-background wp-image-17745\" alt=\"\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephelyfejlesztes-phase-2-1920.jpg\" data-object-fit=\"cover\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephelyfejlesztes-phase-2-1920.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephelyfejlesztes-phase-2-1920-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephelyfejlesztes-phase-2-1920-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephelyfejlesztes-phase-2-1920-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-0 has-background-dim\"><\/span><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"has-text-align-right has-white-color has-black-background-color has-text-color has-background has-link-color has-large-font-size wp-elements-17006d0dcabe0dc104a6a05ad6eb726b\">Phase 2 &#8211; two-story factory building,<br\/>in the same unit as the first plant<\/p>\n<\/div>\n<\/div><\/div>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Phase 2<\/h2>\n\n<h3 class=\"wp-block-heading\">Connecting bridge<\/h3>\n\n<p>The two buildings will be connected by a suspension bridge, ensuring that office and management functions can be integrated into a single unit, eliminating the need for duplication of organizational units in each building. The bridge elements reflect the shape of the company&#8217;s logo. <\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephelyfejlesztes-bridge-1920-3.jpg\" alt=\"\" class=\"wp-image-17749\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephelyfejlesztes-bridge-1920-3.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephelyfejlesztes-bridge-1920-3-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephelyfejlesztes-bridge-1920-3-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-telephelyfejlesztes-bridge-1920-3-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n\n<h3 class=\"wp-block-heading\">Office<\/h3>\n\n<p>The office building, which is being constructed in the second phase, will also include management and changing room facilities. The two-story building&#8217;s employee capacity necessitates the creation of a new changing room block, which will be located on the ground floor, near the employee parking lot. <\/p>\n\n<p>The ground floor of the building houses a reception area, showroom, kitchen, and meeting rooms. Similar to the right tower, this area can be used for receiving guests, relaxation, and product presentations, and, based on its capacity, it can also serve as a venue for celebrations, training sessions, and announcements. <\/p>\n\n<h2 class=\"wp-block-heading\">Representative appearance<\/h2>\n\n<p>During the design process, we paid special attention to ensuring that the Helsinki Road fa\u00e7ade and the company\u2019s reception area would represent high architectural quality while characteristically representing the uniqueness and quality of the brand name.<\/p>\n\n<p>The client&#8217;s expectations greatly influenced the mechanical design: we had to create a flat roof that would be suitable for the aesthetic placement of mechanical equipment (air handling, liquid cooling) while also taking into account noise protection for the neighboring residential areas. The area also provides an opportunity to install a large number of solar panels, contributing significantly to the environmentally conscious operation of the plant building. <\/p>\n\n<h2 class=\"wp-block-heading\">Distinctive interior \u2013 brand and experience<\/h2>\n\n<p>We used the logo as a defining element throughout the entire project, presenting the brand in a distinctive and aesthetic way, even indoors.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-024.jpg\" alt=\"\" class=\"wp-image-17666\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-024.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-024-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-024-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-024-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><figcaption class=\"wp-element-caption\">In the reception area, we placed lamp elements imitating the operation of lathe tools, imitating the company&#8217;s main activity with a cutting head protruding from a row of circularly arranged bodies (Source: BuildEXT).<\/figcaption><\/figure>\n\n<p>An important consideration during the design process was to ensure that the spaces were well-lit, transparent, and comfortable to use. We therefore sought to provide the best possible views from all directions within the building (including the production area) by using appropriate shading, both towards the wooded surroundings and the internal production area. <\/p>\n\n<p>The design of this neck section was an exciting interior design challenge. We definitely wanted to avoid the \u201ctube-like\u201d feel of the corridor, but we decided against installing a glass wall along its entire length for financial reasons \u2013 this section is a fire compartment boundary, so it would have been too expensive to construct the entire section out of glass. <\/p>\n\n<p>We therefore broke up the wall facing the plant with irregularly shaped glass surfaces, which create the impression of alternating sunny and shady sections among the trees. We wanted to give the walls an entertaining and informative function, so on the side facing the office spaces, we created \u201cblind window-like\u201d surfaces where the company history line and milestones can be displayed. <\/p>\n\n<p>For practical reasons, we harmonized the interior wall surfaces of the plant with the other areas using painted design elements \u2013 due to the significant oil mist, we were forced to abandon the interior steel grid design element.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-create-block-buildext-slider-block alignfull slider owl-carousel auto-width owl-theme\"><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-17652\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-017.jpg\" alt=\"The monotony of the corridor is playfully broken up by the darker color painted in the corner of the logo (Source: BuildEXT)\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-017.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-017-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-017-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-017-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>The monotony of the corridor is playfully broken up by the darker color painted in the corner of the logo (Source: BuildEXT)<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-17646\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-014.jpg\" alt=\"Use of brand elements in the corridor connecting the towers (Source: BuildEXT)\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-014.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-014-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-014-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-014-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Use of brand elements in the corridor connecting the towers (Source: BuildEXT)<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-17642\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-012.jpg\" alt=\"Brand elements in the factory area (Source: BuildEXT)\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-012.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-012-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-012-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-012-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Brand elements in the factory area (Source: BuildEXT)<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-17640\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-011.jpg\" alt=\"Brand elements in the factory area (Source: BuildEXT)\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-011.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-011-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-011-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-011-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Brand elements in the factory area (Source: BuildEXT)<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-17632\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-07.jpg\" alt=\"Brand elements in the factory area (Source: BuildEXT)\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-07.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-07-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-07-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-07-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Brand elements in the factory area (Source: BuildEXT)<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-17638\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-010.jpg\" alt=\"Brand elements in the factory area (Source: BuildEXT)\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-010.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-010-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-010-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-010-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Brand elements in the factory area (Source: BuildEXT)<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-17622\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-02.jpg\" alt=\"A clean-lined washbasin with strong characteristics (Source: BuildEXT)\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-02.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-02-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-02-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-02-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>A clean-lined washbasin with strong characteristics (Source: BuildEXT)<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-17630\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-06.jpg\" alt=\"\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-06.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-06-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-06-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2025\/09\/LEMO-interior-1920-06-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/div><\/div>\n\n<p>The renovation of the company&#8217;s premises proves that integrated design of industrial and office functions can be innovative, sustainable, and aesthetic at the same time \u2013 a great project for the future.<\/p>\n\n<div style=\"height:60px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\">Team<\/h3>\n\n<p><strong>BuildEXT<\/strong> <br\/>Project manager and lead designer: Attila T\u00f3th, architect<br\/>Architectural design team: \u00c1d\u00e1m Bujt\u00e1s, Andr\u00e1s C\u00e9dl, Fanni Feh\u00e9r, Korn\u00e9lia Kenyeres, Bence Krajny\u00e1k N., Ad\u00e9l Nyeste, D\u00f3ra Rences, Andr\u00e1s Tatos, D\u00e1niel Zem\u00f3, Csaba V\u00e9gh<br\/>Interior design: D\u00e1vid Cserh\u00e1ti <br\/>Building services engineers: Andr\u00e1s Manherz, Zsolt Czirok, P\u00e9ter T\u00f3th, Barnab\u00e1s Horv\u00e1th, Tam\u00e1s Borsay<br\/>Electrical engineers: Tam\u00e1s Domonics, Ott\u00f3 Nemesv\u00e1ri, Csaba Rasztik, Korn\u00e9l Sziny\u00e9ri, M\u00e1t\u00e9 Zahora <br\/><br\/><strong>K\u00fcls\u0151s szak\u00e1gak<\/strong><br\/>Structural engineer: J\u00e1nos Fejes <br\/>Fire safety engineer: Zsolt Fenyvesi <br\/>Environmental protection: Bal\u00e1zs N\u00e9meth <br\/>Road engineer: Krisztina Grosz <br\/>Utilities engineer: G\u00e1bor K\u00f3cz\u00e1n <br\/>Landscape designer: Edmond Kelemen, Soma Guly\u00e1s <br\/>Acoustics: R\u00f3bert Csott <br\/>Kitchen technology: Mikl\u00f3s Kert\u00e9sz <br\/>Accessibility: Ildik\u00f3 Kakuszin\u00e9 Tamasy<br\/><\/p>\n\n<p><strong>Photos &amp; CGI<\/strong><br\/>BuildEXT<\/p>\n\n<div style=\"height:80px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Swiss group expands manufacturing capacity in Budapest with a newly built electronics component manufacturing plant in two phases.<\/p>\n","protected":false},"author":5,"featured_media":18586,"template":"","meta":{"content-type":"","project_subtitle":"Hi-tech manufacturing technology,<br>contemporary architecture<br>","project_client":"Swiss-owned multinational company","project_size":"12 400 + 9000 m2","project_location":"Budapest","project_completion":"","project_year_of_design":"","project_architect":"Attila T\u00f3th","project_interior_designer":"D\u00e1vid Cserh\u00e1ti","project_awards":"","project_certification":"","project_featured":"true","project_featured_image_portrait":"","footnotes":""},"services":[292,350,293,291,290],"sectors":[299,302],"class_list":["post-18229","projects","type-projects","status-publish","has-post-thumbnail","hentry","services-bim-services","services-concept-design","services-general-design","services-interior-design","services-scan-to-bim-eng","sectors-industrial-building","sectors-office"],"_links":{"self":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/18229","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/users\/5"}],"version-history":[{"count":17,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/18229\/revisions"}],"predecessor-version":[{"id":18809,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/18229\/revisions\/18809"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media\/18586"}],"wp:attachment":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media?parent=18229"}],"wp:term":[{"taxonomy":"services","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/services?post=18229"},{"taxonomy":"sectors","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/sectors?post=18229"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}