{"id":13327,"date":"2022-07-22T17:55:39","date_gmt":"2022-07-22T17:55:39","guid":{"rendered":"https:\/\/buildext.com\/?post_type=projects&#038;p=13327"},"modified":"2026-01-13T08:54:44","modified_gmt":"2026-01-13T08:54:44","slug":"automotive-plant-expansion","status":"publish","type":"projects","link":"https:\/\/buildext.com\/en\/projects\/automotive-plant-expansion\/","title":{"rendered":"Automotive plant expansion"},"content":{"rendered":"<p class='client'>Client: <b>Pall\u00e9r Csarnok Kft.<\/b><p class='size'>Size: <b>1780 m2<\/b><p class='location'>Location: <b>Ny\u00edregyh\u00e1za<\/b><p class='completion'>Completion: <b>2023<\/b><p class='architect'>Architect: <b>Csaba Livj\u00e1k<\/b><p class='services'>Services: <a href=\"https:\/\/buildext.com\/en\/services\/architectural-design\/\" rel=\"tag\">Architectural design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/bim-services\/\" rel=\"tag\">BIM services<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/general-design\/\" rel=\"tag\">General design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/scan-to-bim-eng\/\" rel=\"tag\">Scan to BIM<\/a><p class='sectors'>Sectors: <a href=\"https:\/\/buildext.com\/en\/sectors\/industrial-building\/\" rel=\"tag\">Industrial building<\/a>\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>We were commissioned to prepare the general design for a global tyre manufacturer company&#8217;s planned 2023 factory expansion in Ny\u00edregyh\u00e1za. The BIM model was delivered with <a href=\"https:\/\/buildext.com\/en\/buildext-iso-19650-top-5-iso-documentation\/\" target=\"_blank\" data-type=\"post\" data-id=\"2375\" rel=\"noreferrer noopener\">ISO 19650<\/a> document management and <a href=\"https:\/\/buildext.com\/en\/what-is-lod-loi-log-loin\/\" target=\"_blank\" data-type=\"post\" data-id=\"3970\" rel=\"noreferrer noopener\">LOD 400<\/a>. The bilingual project was fundamentally determined by the complexity of design &amp; build and the need to meet strict client requirements.<\/p>\n\n<h4 class=\"wp-block-heading\"><strong>The project<\/strong><\/h4>\n\n<p>The client wanted to expand their existing hall with a new building due to a technology change. The architectural appearance and massing of the new part of the property were designed to match the existing building in terms of materials and height, in the colors of the client&#8217;s international brand, based on the approved tender design.<\/p>\n\n<p>The project included the construction of a new single-bay hall and two annexes (rest block and storage room, switch room), together with the necessary building services and electrical installations.<\/p>\n\n<h2 class=\"wp-block-heading\">BIM Execution Plan (BEP)<\/h2>\n\n<p>The investor&#8217;s <a href=\"https:\/\/buildext.com\/en\/bim\/\" target=\"_blank\" data-type=\"page\" data-id=\"14333\" rel=\"noreferrer noopener\">BIM <\/a> protocol precisely defined the requirements for the project, for which our solution was proposed in the <a href=\"https:\/\/buildext.com\/en\/what-is-bep-eir-cde\/#bep\" data-type=\"post\" data-id=\"3967\" target=\"_blank\" rel=\"noreferrer noopener\">BEP<\/a>. Accordingly, the building model was made suitable for other <a href=\"https:\/\/buildext.com\/en\/bim\/#szimulaciok-analizisek\" target=\"_blank\" rel=\"noreferrer noopener\">simulations<\/a> of the building&#8217;s operation, for on-site <a href=\"https:\/\/buildext.com\/en\/bim\/#bim-alapu-kivitelezeskoordinacio\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/buildext.com\/bim\/#bim-alapu-kivitelezeskoordinacio\" rel=\"noreferrer noopener\">BIM-based construction coordination<\/a> and was prepared to be further developed into a <a href=\"https:\/\/buildext.com\/en\/digital-twin\/#mi-az-as-built-modell\" target=\"_blank\" rel=\"noreferrer noopener\">realization model<\/a>. The central model was designed to be classified up to level 3 according to the <a href=\"https:\/\/buildext.com\/en\/bim-classification\/\" target=\"_blank\" data-type=\"post\" data-id=\"14963\" rel=\"noreferrer noopener\">uniform classification scheme<\/a>.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"879\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/Michelin-Dalux-gepeszet-800.jpg\" alt=\"\" class=\"wp-image-13108\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/Michelin-Dalux-gepeszet-800.jpg 800w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/Michelin-Dalux-gepeszet-800-273x300.jpg 273w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/Michelin-Dalux-gepeszet-800-768x844.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n<p>The digital ecosystem is designed to be a flexible system, combining the principles of <a href=\"https:\/\/buildext.com\/en\/closed-bim-vs-open-bim\/\" target=\"_blank\" data-type=\"post\" data-id=\"14614\" rel=\"noreferrer noopener\">open BIM and closed BIM<\/a>, so that it can integrate additional project participants at any time. Software used in this project:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>static: Allplan, Tekla<\/li>\n\n\n\n<li>architecture, mechanical and electrical engineering: Revit<\/li>\n\n\n\n<li>fire protection, road and pavement: AutoCAD<\/li>\n\n\n\n<li>BIM coordination: Navisworks<\/li>\n\n\n\n<li>CDE: Dalux<\/li>\n<\/ul>\n\n<h2 class=\"wp-block-heading\">Common Data Environment (CDE)<\/h2>\n\n<p>An important feature of a well-functioning BIM methodology is that <\/p>\n\n<ul class=\"wp-block-list\">\n<li>all data comes from the same source<\/li>\n\n\n\n<li>data is regularly updated<\/li>\n\n\n\n<li>their visibility to stakeholders must be ensured through rules.<\/li>\n<\/ul>\n\n<p>For these reasons, <strong>Dalux<\/strong> was also used as the Common Data Environment for this project, because the transparency, easy accessibility, and manageability provided by the software make the implementation of the undertakings very smooth.<\/p>\n\n<h4 class=\"wp-block-heading\">Document management and approval process<\/h4>\n\n<p>The aim was to give participants access to the information they needed without the use of special (e.g. discipline-specific) software. To get the stakeholders up to speed with Dalux, we have organized <strong>training<\/strong>. As a result, all stakeholders can easily access the current plans from anywhere (office, on the move, on the ground), and can comment or manage changes from their smartphone or tablet.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-create-block-buildext-cover-block alignfull offset-text-left cover\" style=\"min-height:704px\"><div class=\"desktop\" style=\"background-image:url(https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/Michelin-Dalux-AR-mobil-onsite-1080.jpeg)\"><\/div><div class=\"mobile\" style=\"background-image:url(https:\/\/buildext.com\/wp-content\/uploads\/2022\/12\/Dalux-mobil-terepen.jpg)\"><\/div><div class=\"inner-container\">\n<div class=\"wp-block-group is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"cover-mobile-p has-black-color has-white-background-color has-text-color has-background has-link-color has-large-font-size wp-elements-3952a1297df648c46a68cb83b50a2254\"><strong>AR visualization<br\/>in construction coordination<\/strong><\/p>\n<\/div>\n<\/div><\/div>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>In Dalux, the <strong>approval process<\/strong> is set up for the six levels of the project organisation (Client &#8211; Project Manager &#8211; Technical Inspector &#8211; Contractor &#8211; General Designer &#8211; Branch Designers). We have also defined the storage location of files in different statuses (work, shared, accepted, delivered), the identity and order of approvers, and change management rules, which allowed us to avoid misunderstandings from time-consuming phone calls and emails.<\/p>\n\n<p>We used <strong>bilingual<\/strong> (English, Hungarian) settings in the interface so that project participants with limited or no language skills could filter and view documents easily.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Gumiabroncsgy\u00e1rt\u00f3 v\u00e1llalat csarnokb\u0151v\u00edt\u00e9s, Ny\u00edregyh\u00e1za \/\/ k\u00e9tnyelv\u0171 inform\u00e1ci\u00f3s fel\u00fclet (Dalux)\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/Jl0i278FygY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h4 class=\"wp-block-heading\">Scan to BIM<\/h4>\n\n<p>At the start of the project, we carried out a <a href=\"https:\/\/buildext.com\/en\/what-is-scan-to-bim\/\" target=\"_blank\" data-type=\"post\" data-id=\"14744\" rel=\"noreferrer noopener\"><strong>point cloud survey<\/strong><\/a> of the existing property, detailing and showing in a <a href=\"https:\/\/buildext.com\/en\/what-is-bep-eir-cde\/#cde\" target=\"_blank\" data-type=\"post\" data-id=\"3967\" rel=\"noreferrer noopener\">CDE environment<\/a> the exact location of the fire protection, mechanical and electrical equipment to be relocated on the front wall of the existing hall. We then built a 3D, detailed BIM model of the new part of the plant in <a href=\"https:\/\/buildext.com\/en\/what-is-lod-loi-log-loin\/\" target=\"_blank\" data-type=\"post\" data-id=\"3970\" rel=\"noreferrer noopener\">LOD400<\/a>.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Gumiabroncsgy\u00e1rt\u00f3 csarnokb\u0151v\u00edt\u00e9se, Ny\u00edregyh\u00e1za \/\/ Pontfelh\u0151 \u00e9s BIM modell (Dalux)\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/NZf9y2L7lS8?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>We shared the current plans on the Dalux interface so that the parts to be demolished, moved, or replaced were visible and identifiable. <\/p>\n\n<p>For example, the shutter gates and escape doors in the old hall were used in the new extension for cost-efficiency reasons (red: to be demolished, blue: to be incorporated).<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image alignwide size-full\"><img decoding=\"async\" width=\"2560\" height=\"1420\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/03\/Gumiabroncsgyarto-Dalux-door-relocation-1920x1065-2-scaled.jpg\" alt=\"\" class=\"wp-image-13305\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/03\/Gumiabroncsgyarto-Dalux-door-relocation-1920x1065-2-scaled.jpg 2560w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/03\/Gumiabroncsgyarto-Dalux-door-relocation-1920x1065-2-300x166.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/03\/Gumiabroncsgyarto-Dalux-door-relocation-1920x1065-2-1920x1065.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/03\/Gumiabroncsgyarto-Dalux-door-relocation-1920x1065-2-768x426.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/03\/Gumiabroncsgyarto-Dalux-door-relocation-1920x1065-2-1536x852.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/03\/Gumiabroncsgyarto-Dalux-door-relocation-1920x1065-2-2048x1136.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>With the information shared and a consistent approval process, decisions could be made clearly and transparently for all phases, so the implementation was smooth and without any disruption.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-gallery alignfull has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1920\" height=\"1440\" data-id=\"13229\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited-1920x1440.jpg\" alt=\"\" class=\"wp-image-13229\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited-1920x1440.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited-300x225.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited-768x576.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited-1536x1152.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited.jpg 2048w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image alignwide size-large\"><img decoding=\"async\" width=\"1920\" height=\"1440\" data-id=\"13231\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited_2-1920x1440.jpg\" alt=\"\" class=\"wp-image-13231\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited_2-1920x1440.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited_2-300x225.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited_2-768x576.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited_2-1536x1152.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/02\/IMG_0396_edited_2.jpg 2048w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/figure>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\">Team<\/h3>\n\n<p><strong>BuildEXT<\/strong> <br\/>Architect: Csaba Livj\u00e1k <br\/>Project leader: Csaba Faltusz <br\/>BIM project leader: Tam\u00e1s Soms\u00e1k <br\/>Architectural design team: M\u00e1rk Fels\u0151, \u00c1lmos Jablonkay, D\u00e1vid Lov\u00e1sz, S\u00e1ndor Nagy<br\/><br\/><strong>Discipline partners<\/strong><br\/>Structure: Zsolt Kov\u00e1cs <br\/>Building services engineering: Bal\u00e1zs Dr. Andr\u00e1s-T\u00f6vissi<br\/>High voltage: J\u00e1nos Haratik <br\/>Low voltage: K\u00e1roly Bors\u00e1nyi <br\/>Sprinklers: S\u00e1ndor Mezei <br\/>Utilities: Attila B\u00edr\u00f3 <br\/>Fire protection: Mikl\u00f3s L\u00e1z\u00e1r <br\/>Roads: Krisztina Grosz<\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>LOD400 detailed plan according to ISO 19650<\/p>\n","protected":false},"author":8,"featured_media":14047,"template":"","meta":{"content-type":"","project_subtitle":"LOD400 BIM model -<br>we pay attention to details","project_client":"Pall\u00e9r Csarnok Kft.","project_size":"1780 m2","project_location":"Ny\u00edregyh\u00e1za","project_completion":"2023","project_year_of_design":"","project_architect":"Csaba Livj\u00e1k","project_interior_designer":"","project_awards":"","project_certification":"","project_featured":"true","project_featured_image_portrait":"","footnotes":""},"services":[305,292,293,290],"sectors":[299],"class_list":["post-13327","projects","type-projects","status-publish","has-post-thumbnail","hentry","services-architectural-design","services-bim-services","services-general-design","services-scan-to-bim-eng","sectors-industrial-building"],"_links":{"self":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/13327","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/users\/8"}],"version-history":[{"count":2,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/13327\/revisions"}],"predecessor-version":[{"id":18321,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/13327\/revisions\/18321"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media\/14047"}],"wp:attachment":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media?parent=13327"}],"wp:term":[{"taxonomy":"services","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/services?post=13327"},{"taxonomy":"sectors","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/sectors?post=13327"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}