{"id":13021,"date":"2022-07-27T15:36:00","date_gmt":"2022-07-27T15:36:00","guid":{"rendered":"https:\/\/buildext.com\/?post_type=projects&#038;p=13021"},"modified":"2026-04-13T14:46:39","modified_gmt":"2026-04-13T14:46:39","slug":"weinberg-office-building","status":"publish","type":"projects","link":"https:\/\/buildext.com\/en\/projects\/weinberg-office-building\/","title":{"rendered":"Weinberg office building"},"content":{"rendered":"\n<div class=\"wp-block-group is-layout-flow wp-block-group-is-layout-flow\"><p class='client'>Client: <b>Weinberg 93 \u00c9p\u00edt\u0151 Kft.<\/b><p class='size'>Size: <b>1090 m2<\/b><p class='location'>Location: <b>S\u00e1rospatak<\/b><p class='completion'>Completion: <b>2023<\/b><p class='architect'>Architect: <b>Csaba Livj\u00e1k<\/b><p class='services'>Services: <a href=\"https:\/\/buildext.com\/en\/services\/architectural-design\/\" rel=\"tag\">Architectural design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/bim-services\/\" rel=\"tag\">BIM services<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/concept-design\/\" rel=\"tag\">Concept design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/general-design\/\" rel=\"tag\">General design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/interior-design\/\" rel=\"tag\">Interior design<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/project-management\/\" rel=\"tag\">Project management<\/a>, <a href=\"https:\/\/buildext.com\/en\/services\/scan-to-bim-eng\/\" rel=\"tag\">Scan to BIM<\/a><p class='sectors'>Sectors: <a href=\"https:\/\/buildext.com\/en\/sectors\/industrial-building\/\" rel=\"tag\">Industrial building<\/a>, <a href=\"https:\/\/buildext.com\/en\/sectors\/office\/\" rel=\"tag\">Office<\/a>\n\n\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>We were asked by one of Hungary&#8217;s leading steel structure manufacturers and contractors to design and accompany the expansion of their office in S\u00e1rospatak with <a href=\"https:\/\/buildext.com\/en\/bim\/#bim-alapu-kivitelezeskoordinacio\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/buildext.com\/bim\/#bim-alapu-kivitelezeskoordinacio\" rel=\"noreferrer noopener\">BIM-based project management<\/a>. In addition to the existing building with its <a href=\"https:\/\/buildext.com\/en\/projects\/weinberg-light-reflection-facade\/\" data-type=\"projects\" data-id=\"201\" target=\"_blank\" rel=\"noreferrer noopener\">unique fa\u00e7ade<\/a>, we dreamt up a more restrained block connected by a neck link, as requested by the client. The entire project is summarised in this video:<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Weinberg Irodah\u00e1z 2024\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/l5QMyf-MKm4?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">The Client<\/h2>\n\n\n\n<p>Since 1993, <a href=\"https:\/\/weinberg.hu\/\" data-type=\"link\" data-id=\"https:\/\/weinberg.hu\/\" target=\"_blank\" rel=\"noopener\">Weinberg Kft<\/a>. has been engaged in the construction of industrial and commercial buildings, typically halls, and the manufacture of steel structures for buildings. The company, which is 100% Hungarian-owned, is growing very dynamically and has become a significant player in the Hungarian construction industry at a national level, and its activities have been recognised with numerous professional awards.<\/p>\n\n\n\n<p>They are also responsible for the steel frame of the roof structure of the Hungarian House of Music and the steel structure of the fa\u00e7ade of the New Ethnographic Museum, but they have also produced and installed several unique works also in the USA.<\/p>\n<\/div>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image alignfull has-custom-border is-style-default\"><img decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-homlokzat-kep-07-1920x1080.jpg\" alt=\"The building to be extended, with the award-winning light-reflecting fa&#xE7;ade (Photo: BuildEXT)\" class=\"wp-image-1937\" style=\"border-style:none;border-width:0px;border-radius:0px\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-homlokzat-kep-07-1920x1080.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-homlokzat-kep-07-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-homlokzat-kep-07-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-homlokzat-kep-07-1536x864.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-homlokzat-kep-07-2048x1152.jpg 2048w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><figcaption class=\"wp-element-caption\">The building to be extended, with the award-winning light-reflecting fa\u00e7ade (Photo: BuildEXT)<\/figcaption><\/figure>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">The Conditions<\/h2>\n\n<p>The company is located on the outskirts of S\u00e1rospatak, on the site of the old Millstone factory, on two plots of land facing each other and separated by a street. As a result of the division of territory, the &#8220;old&#8221; site housed a small training hall, while the former millstone factory building, more than 100 years old, was used for the finance and preparation department. Across the street &#8211; the site of the current development &#8211; were the production halls, warehouses, and an office headquarters, which housed the production management, the business unit, and the C-level management of the company.<\/p>\n\n<p>Operating in two locations was causing increasing operational difficulties, so management sought a solution to consolidate functions into one area.<\/p>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1080\" height=\"529\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/weinberg-telephely-5-cropped-small.jpg\" alt=\"\" class=\"wp-image-13564\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/weinberg-telephely-5-cropped-small.jpg 1080w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/weinberg-telephely-5-cropped-small-300x147.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/weinberg-telephely-5-cropped-small-768x376.jpg 768w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><figcaption class=\"wp-element-caption\">Existing hall building of Weinberg 93<\/figcaption><\/figure>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>As the development of the old office building was not possible for both economic and layout reasons, we were asked to design a new office building.<\/p>\n\n<p>The project required the building to be expandable, to form an integral unit with the existing office building, which serves as the headquarters of the production hall, and to functionally reunite the company&#8217;s management and production management. <\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Iron strong connection<\/h2>\n\n<p>The planned new office will consist of two parts: a three-story building with a pillar frame and a neck wing, which will create a functional unity between the old and the new facility by connecting the offices of the main building with a bridge structure.<\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-create-block-buildext-slider-block alignfull slider owl-carousel auto-width owl-theme\"><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-5734\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-01.jpg\" alt=\"Weinberg new office building from the street front (visual plan)\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-01.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-01-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-01-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-01-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>Weinberg new office building from the street front (visual plan)<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-5736\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-02.jpg\" alt=\"The new building will house offices, meeting rooms and service facilities\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-02.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-02-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-02-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-02-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>The new building will house offices, meeting rooms and service facilities<\/span><\/div><div><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-5738\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-03.jpg\" alt=\"The new office building will be connected to the existing building by a bridge (plan)\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-03.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-03-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-03-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/weinberg-office-03-1536x864.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><span>The new office building will be connected to the existing building by a bridge (plan)<\/span><\/div><div><img decoding=\"async\" width=\"1152\" height=\"768\" class=\"wp-image-13547\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/Weinberg-irodahaz-latvanyterv-napelemek.jpg\" alt=\"32 000 kWh of solar panels to support environmentally friendly operations\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/Weinberg-irodahaz-latvanyterv-napelemek.jpg 1152w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/Weinberg-irodahaz-latvanyterv-napelemek-300x200.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/Weinberg-irodahaz-latvanyterv-napelemek-768x512.jpg 768w\" sizes=\"(max-width: 1152px) 100vw, 1152px\" \/><span>32 000 kWh of solar panels to support environmentally friendly operations<\/span><\/div><\/div>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>The new building will house offices, meeting rooms and their service facilities &#8211; reception, canteen, kitchen, toilets, kitchenette, etc., &#8211; while the existing building will provide office space with minimal modifications and almost the same functions as the existing building.  The company planned to install 32,000 kWh of solar panels on the roof.<\/p>\n\n<h2 class=\"wp-block-heading\">Modern office space<\/h2>\n\n<p>At the customer&#8217;s request, we have designed flexible, post-Covid solutions that meet the requirements of the times and ensure optimal utilisation and employee satisfaction in the long term.<\/p>\n\n<p>For example, mobile walls can connect the canteen to two adjacent meeting rooms, creating a communal space for smaller corporate events. The open office space is broken up by two-person chatboxes for short meetings, while highly automated, smart-system lighting and engineering for staff comfort.<\/p>\n\n<p>Due to the profile of the company, we used a lot of steel and glass, complemented by elements that make the interiors more welcoming from a visual, tactile and acoustic point of view.<\/p>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-cover alignfull is-light\" style=\"min-height:639px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-0 has-background-dim\"><\/span><img decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-block-cover__image-background wp-image-13646\" alt=\"\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-irodahaz-belso-latvanyterv-017-1920x1080.jpg\" data-object-fit=\"cover\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-irodahaz-belso-latvanyterv-017-1920x1080.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-irodahaz-belso-latvanyterv-017-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-irodahaz-belso-latvanyterv-017-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-irodahaz-belso-latvanyterv-017-1536x864.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/07\/Weinberg-irodahaz-belso-latvanyterv-017.jpg 2048w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<p class=\"has-text-align-left has-white-color has-black-background-color has-text-color has-background has-link-color has-large-font-size wp-elements-7279374ea88ee759f60b1dc2a11e599c\">Conscious use of colour and materials<br\/>in line with the image<\/p>\n<\/div><\/div>\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">BIM fundamentals<\/h2>\n\n<p>The ISO 19650 project was based on a highly accurate <strong>georeferenced point cloud<\/strong> of 12 billion points, created by the reality capture division of Buildext. The design was carried out in one of the world&#8217;s most advanced design systems, Autodesk Revit, a little known environment in Hungary, using <a href=\"https:\/\/buildext.com\/en\/closed-bim-vs-open-bim\/\" target=\"_blank\" data-type=\"post\" data-id=\"14614\" rel=\"noreferrer noopener\">closed BIM<\/a> methodology.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"640\" height=\"297\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/weinberg-pontfelho-640-3.png\" alt=\"\" class=\"wp-image-13574\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/weinberg-pontfelho-640-3.png 640w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/weinberg-pontfelho-640-3-300x139.png 300w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>At the beginning of the project, a <strong>BIM Execution Plan<\/strong> (<a href=\"https:\/\/buildext.com\/en\/what-is-bep-eir-cde\/#bep\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/buildext.com\/mi-a-bep-eir-cde\/#bep\" rel=\"noreferrer noopener\"><strong>BEP<\/strong><\/a>) was prepared, defining the roles and responsibilities of the stakeholders, the processes and, of course, the way of communication. The <a href=\"https:\/\/buildext.com\/en\/bim-objectives\/\" target=\"_blank\" data-type=\"post\" data-id=\"3870\" rel=\"noreferrer noopener\">BIM goals<\/a> included the preparation of quantity take-offs and <a href=\"https:\/\/buildext.com\/en\/bim\/#szimulaciok-analizisek\" target=\"_blank\" rel=\"noreferrer noopener\">simulations<\/a> of the building&#8217;s operation (wet-out, thermal analysis, etc.), <a href=\"https:\/\/buildext.com\/en\/bim\/#bim-alapu-kivitelezeskoordinacio\" target=\"_blank\" rel=\"noreferrer noopener\">BIM-based on-site construction coordination<\/a> and <a href=\"https:\/\/buildext.com\/en\/digital-twin\/#mi-az-as-built-modell\" target=\"_blank\" rel=\"noreferrer noopener\">as-built model<\/a>.<\/p>\n\n<p>We supported the construction with <strong><a href=\"https:\/\/buildext.com\/en\/what-is-scan-to-bim\/\" target=\"_blank\" data-type=\"post\" data-id=\"14744\" rel=\"noreferrer noopener\">scan to BIM<\/a><\/strong> activities: we regularly scanned back the as-built condition and compared it with the plans. This allowed us to identify many of the faults before the installation phase, so that we could suggest solutions, saving considerable cost, time and frustration during the project.<\/p>\n\n<p>This time the <strong>common data environment<\/strong> (<a href=\"https:\/\/buildext.com\/en\/what-is-bep-eir-cde\/#cde\" data-type=\"post\" data-id=\"3967\" target=\"_blank\" rel=\"noreferrer noopener\">CDE<\/a>) was Dalux, and after the setup we taught the practical use of the software several times; first in office conditions, later we started to use the interface together in the field, which was supported by a fixed, remote workstation during the project.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-video\"><video height=\"1080\" style=\"aspect-ratio: 1920 \/ 1080;\" width=\"1920\" controls=\"\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/Dalux-Weinberg.mp4\"><\/video><\/figure>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>We invited the project stakeholders &#8211; the client, project managers, designers and construction participants &#8211; to the platform, which, as a common, closed communication platform, accelerated and simplified communication, allowing everyone to see the same information.<\/p>\n\n<p>Dalux was not only used to monitor progress, record defects and ensure quality, but also to <a href=\"https:\/\/buildext.com\/en\/digital-twin\/#mi-az-as-built-modell\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/buildext.com\/digital-twin\/#mi-az-as-built-modell\" rel=\"noreferrer noopener\">track the actual state of construction<\/a> during the bi-weekly design visits.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-cover alignfull is-light\" style=\"min-height:783px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim-0 has-background-dim\"><\/span><img decoding=\"async\" width=\"1920\" height=\"1231\" class=\"wp-block-cover__image-background wp-image-12570\" alt=\"\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2023\/12\/weinberg-latogatas-buildext-1920x1231.jpg\" data-object-fit=\"cover\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2023\/12\/weinberg-latogatas-buildext-1920x1231.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/12\/weinberg-latogatas-buildext-300x192.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/12\/weinberg-latogatas-buildext-768x492.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/12\/weinberg-latogatas-buildext-1536x985.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/12\/weinberg-latogatas-buildext.jpg 2048w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<p class=\"has-text-align-left offset-text-left has-white-color has-black-background-color has-text-color has-background has-link-color has-large-font-size wp-elements-a046fa9f09043a99659db24786e13d52\"><strong>Virtual Design &amp; Construction<br\/>in the Weinberg project<\/strong><\/p>\n<\/div><\/div>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>The project was not extremely challenging from an architectural point of view, but the mechanical engineering was relatively complex, including ceiling and underfloor heating and air conditioning systems. During the design phase, we carried out regular <strong><a href=\"https:\/\/buildext.com\/en\/bim\/#bim-tervezes-tamogatasa\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/buildext.com\/bim\/#bim-tervezes-tamogatasa\" rel=\"noreferrer noopener\">clash detections<\/a><\/strong>, so that even with <a href=\"https:\/\/buildext.com\/en\/what-is-lod-loi-log-loin\/\" target=\"_blank\" data-type=\"post\" data-id=\"3970\" rel=\"noreferrer noopener\">LOD 300<\/a> detailing, the installation work was trouble-free.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image alignwide size-full\"><img decoding=\"async\" width=\"1555\" height=\"1158\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2023\/11\/MEP-Weinberg-office-featured.jpg\" alt=\"\" class=\"wp-image-12340\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2023\/11\/MEP-Weinberg-office-featured.jpg 1555w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/11\/MEP-Weinberg-office-featured-300x223.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/11\/MEP-Weinberg-office-featured-768x572.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/11\/MEP-Weinberg-office-featured-1536x1144.jpg 1536w\" sizes=\"(max-width: 1555px) 100vw, 1555px\" \/><figcaption class=\"wp-element-caption\">MEP model of the new Weinberg office building (BuildEXT)<\/figcaption><\/figure>\n\n<p>Interior design solutions were also included in the <strong>multi-disciplinary 3D model<\/strong>. From sketchpauses to AI-based image generation tools, we used a range of tools to create a <strong>conceptual design<\/strong> for the building, and from this the draft model, which was presented to the client in a video and interactive virtual tour.<\/p>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Weinberg 93 irodah\u00e1z VR bej\u00e1r\u00e1s\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/pnEvDE8SOIs?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n<p>Thanks to <strong>VR technology<\/strong> and spectacular, lifelike visualisation, we can get a better sense of the scale of the space, the quality of the materials and the overall effect, which we could even modify in real time.<\/p>\n\n<p>What was new was that we also used artificial intelligence to bring interior designs and graphics to life; with the help of the <strong>Midjourney<\/strong> creation system, we were able to create radically different concepts very quickly.<\/p>\n\n<h2 class=\"wp-block-heading\">Simulations in virtual space<\/h2>\n\n<p>By placing the BIM model in a simulation environment, we optimised the <strong><a href=\"https:\/\/buildext.com\/en\/bim\/#szimulaciok-analizisek\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/buildext.com\/bim\/#szimulaciok-analizisek\" rel=\"noreferrer noopener\">energy use of the building<\/a><\/strong>, reducing operational carbon emissions, which are of key importance for <a href=\"https:\/\/buildext.com\/en\/bim-esg\/\" target=\"_blank\" data-type=\"post\" data-id=\"14081\" rel=\"noreferrer noopener\">ESG<\/a>.<\/p>\n\n<p>A partial <strong><a href=\"https:\/\/buildext.com\/en\/bim-dimenziok-2-2\/#4DBIM\" target=\"_blank\" data-type=\"post\" data-id=\"3833\" rel=\"noreferrer noopener\">4D schedule<\/a><\/strong> has been prepared to support the implementation. Our BIM model &#8220;knows&#8221; exactly what materials will be installed, so by linking the time and resource requirements of each construction phase, the standard times and the logical sequence of construction, the system can simulate the progress of construction to the day. This allowed us to anticipate slips, giving us the opportunity to correct them.<\/p>\n\n<figure class=\"wp-block-video\"><video height=\"720\" style=\"aspect-ratio: 1280 \/ 720;\" width=\"1280\" controls=\"\" muted=\"\" poster=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/Weinberg-4D-video-poster.jpg\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/04\/Weinberg-4D-BIM-simulation_.mp4\"><\/video><\/figure>\n\n<p>Weinberg&#8217;s profile was fortunate for the project &#8211; the steel structural elements of the bridge connecting the new section to the old section were <a href=\"https:\/\/buildext.com\/en\/bim\/#eloregyartas\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/buildext.com\/bim\/#eloregyartas\" rel=\"noreferrer noopener\"><strong>prefabricated<\/strong><\/a> and assembled by the client.<\/p>\n\n<p>The status of the construction was also regularly documented using <strong>OpenSpace<\/strong>, which allows a 360-degree virtual tour using existing floor plans, from 360-degree video taken during site visits. Not only does it support technical monitoring and project management, but it also logs and compares any two snapshots in split view.<\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1920\" height=\"1440\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2023\/07\/Weinberg-AR-Dalux-1920x1440.jpg\" alt=\"OpenSpace effectively supports technical supervision\" class=\"wp-image-11693\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2023\/07\/Weinberg-AR-Dalux-1920x1440.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/07\/Weinberg-AR-Dalux-300x225.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/07\/Weinberg-AR-Dalux-768x576.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/07\/Weinberg-AR-Dalux-1536x1152.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/07\/Weinberg-AR-Dalux-2048x1536.jpg 2048w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><figcaption class=\"wp-element-caption\">OpenSpace effectively supports technical supervision<\/figcaption><\/figure>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading has-text-align-left\">International recognition<\/h2>\n\n<p>The exemplary nature of the project also caught the attention of the CDE developer, who was able to present the design and construction workflow of the Weinberg office building to nearly 2,000 engineers from 130 countries at Dalux&#8217;s annual conference, the <a href=\"https:\/\/buildext.com\/en\/dalux-summit-2023\/\" data-type=\"post\" data-id=\"12379\">Dalux Summit, in Copenhagen<\/a>.<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2023\/11\/Dalux-Summit-2023-BuildEXT-Arcoord-01-1920x1080.jpg\" alt=\"BuildEXT BIM Manager to present the Weinberg office building project at Dalux Summit 2023 in Copenhagen\" class=\"wp-image-12381\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2023\/11\/Dalux-Summit-2023-BuildEXT-Arcoord-01-1920x1080.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/11\/Dalux-Summit-2023-BuildEXT-Arcoord-01-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/11\/Dalux-Summit-2023-BuildEXT-Arcoord-01-768x432.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/11\/Dalux-Summit-2023-BuildEXT-Arcoord-01-1536x864.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/11\/Dalux-Summit-2023-BuildEXT-Arcoord-01-2048x1152.jpg 2048w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><figcaption class=\"wp-element-caption\">BuildEXT BIM Manager to present the Weinberg office building project at Dalux Summit 2023 in Copenhagen<\/figcaption><\/figure>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>The result: a flexible and modern open office with highly automated engineering, delivered on budget and on time, as part of an internationally acclaimed project, and an <a href=\"https:\/\/buildext.com\/en\/digital-twin\/\" target=\"_blank\" data-type=\"post\" data-id=\"14839\" rel=\"noreferrer noopener\">information-rich digital model<\/a> ready to operate, develop and transform.<\/p>\n\n<div style=\"height:70px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\">Team<\/h3>\n\n<p><strong>BuildEXT<\/strong> <br\/>Project leader, lead architect: Csaba Livj\u00e1k<br\/>G\u00e1bor Bazsali, Gergely Chladny, D\u00e1niel Csall\u00f3k\u00f6zi, D\u00e1vid Cserh\u00e1ti, Csaba Faltusz, M\u00e1rk Fels\u0151, Bence Krajny\u00e1k N., Gabriella Madari, Norbert Pint\u00e9r, Bal\u00e1zs S\u00f3ti, J\u00e1nos Varga<\/p>\n\n<p><strong>Photos &amp; CGI<\/strong><br\/>BuildEXT<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BIM-based design and project management for a leading steel structure manufacturer and contractor<\/p>\n","protected":false},"author":8,"featured_media":13033,"template":"","meta":{"content-type":"","project_subtitle":"21st century office relaxation project management in BIM workflow","project_client":"Weinberg 93 \u00c9p\u00edt\u0151 Kft.","project_size":"1090 m2","project_location":"S\u00e1rospatak","project_completion":"2023","project_year_of_design":"","project_architect":"Csaba Livj\u00e1k","project_interior_designer":"","project_awards":"","project_certification":"","project_featured":"true","project_featured_image_portrait":"","footnotes":""},"services":[305,292,350,293,291,289,290],"sectors":[299,302],"class_list":["post-13021","projects","type-projects","status-publish","has-post-thumbnail","hentry","services-architectural-design","services-bim-services","services-concept-design","services-general-design","services-interior-design","services-project-management","services-scan-to-bim-eng","sectors-industrial-building","sectors-office"],"_links":{"self":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/13021","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/users\/8"}],"version-history":[{"count":6,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/13021\/revisions"}],"predecessor-version":[{"id":18316,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/projects\/13021\/revisions\/18316"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media\/13033"}],"wp:attachment":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media?parent=13021"}],"wp:term":[{"taxonomy":"services","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/services?post=13021"},{"taxonomy":"sectors","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/sectors?post=13021"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}