{"id":9428,"date":"2022-11-28T12:54:17","date_gmt":"2022-11-28T12:54:17","guid":{"rendered":"https:\/\/buildext.com\/?p=9428"},"modified":"2022-12-07T11:25:28","modified_gmt":"2022-12-07T11:25:28","slug":"without-information-bim-is-shocking","status":"publish","type":"post","link":"https:\/\/buildext.com\/en\/without-information-bim-is-shocking\/","title":{"rendered":"BIM without information is a shocking experience"},"content":{"rendered":"\n<p><strong>&#8220;I don&#8217;t know what the potential of BIM is, but I&#8217;ve spoken to five design firms, both smaller and larger than yours, all of whom said that most of their projects are in BIM, it&#8217;s only natural that all firms should be ready for it.&#8221;<\/strong><\/p>\n\n<p>That phrase I got from one of our guests &#8211; rightly so &#8211; and I get it from our customers countless times. But now I&#8217;ve had enough and I&#8217;m going to explain the difference as no one has ever done before&#8230; (think of any emoticons here you like).<\/p>\n\n<p>Did you know BIM is like the electric wiring in the old electrician joke?<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-group alignfull is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-cover alignfull\" style=\"min-height:790px;aspect-ratio:unset;\"><span aria-hidden=\"true\" class=\"wp-block-cover__background has-background-dim\"><\/span><img decoding=\"async\" width=\"1920\" height=\"1280\" class=\"wp-block-cover__image-background wp-image-9407\" alt=\"Az a vezet\u00e9k amelyikben van \u00e1ram, \nugyan\u00fagy n\u00e9z ki, mint amelyikben nincs\u2026 \nCsak m\u00e1s a fog\u00e1sa. Ugyanez a helyzet a BIM-mel.\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/11\/elektromos-aram-drot-szerelo-biztositek.jpg\" style=\"object-position:22% 66%\" data-object-fit=\"cover\" data-object-position=\"22% 66%\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/11\/elektromos-aram-drot-szerelo-biztositek.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/11\/elektromos-aram-drot-szerelo-biztositek-300x200.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/11\/elektromos-aram-drot-szerelo-biztositek-768x512.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/11\/elektromos-aram-drot-szerelo-biztositek-1536x1024.jpg 1536w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><div class=\"wp-block-cover__inner-container is-layout-flow wp-block-cover-is-layout-flow\">\n<p class=\"has-text-align-left has-black-color has-white-background-color has-text-color has-background has-large-font-size\"><strong>&#8220;The wire with electricity in it <br\/>looks the same as the one without&#8230; <br\/>Only the feeling of holding it is different &#8220;<\/strong><\/p>\n<\/div><\/div>\n<\/div>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>The same is the case with BIM.<\/p>\n\n<p>A 3D model with organized <strong><span style=\"text-decoration: underline;\">data<\/span><\/strong> looks the same as one without. Only it will be good for something else.<\/p>\n\n<p>Because even if you install the electricity in your house, nothing will work. If it has no <strong><span style=\"text-decoration: underline;\">electricity<\/span><\/strong>, it&#8217;s worthless. Yet it is the basis of everything.<\/p>\n\n<div class=\"wp-block-group alignwide is-layout-constrained wp-block-group-is-layout-constrained\">\n<h2 class=\"has-white-color has-black-background-color has-text-color has-background wp-block-heading\">What is in the wire is ELECTRICITY, <br\/>is DATA in the BIM model.<\/h2>\n<\/div>\n\n<p>This is the basis of everything.<\/p>\n\n<p>But it&#8217;s no use having <strong><span style=\"text-decoration: underline;\">electricity<\/span><\/strong> in your house if it&#8217;s not good, or if you don&#8217;t connect devices to it. (At most, you&#8217;ll be shocked if you built the system wrong.)<\/p>\n\n<p>That&#8217;s when it all starts to make sense when you put a device on it.<\/p>\n\n<p>Then the washing machine replaces the hand washing, the cooker cooks the ham, the TV and computer switch on and entertain and suddenly everything comes to life.<\/p>\n\n<p>Because cables carry the electricity our devices transform into services and convenience.<\/p>\n\n<h2 class=\"wp-block-heading\">BIM works the same way<\/h2>\n\n<p>The data stored in the building model is worth nothing in itself, and neither is the electricity. But if you plug in an app or a communication platform, you suddenly have<\/p>\n\n<ul class=\"wp-block-list\">\n<li>more accurate planning,<\/li>\n\n\n\n<li>faster change tracking,<\/li>\n\n\n\n<li>AR so the contractor understands the house,<\/li>\n\n\n\n<li>less extra work,<\/li>\n\n\n\n<li>and the operator knows where to turn off the tap or which pump is broken and how to fix it.<\/li>\n<\/ul>\n\n<p>Because software running on smart devices makes the <strong><span style=\"text-decoration: underline;\">data<\/span><\/strong> in the BIM model accessible and our increasingly complex systems and applications transform data into solutions, speed, and convenience.<\/p>\n\n<p>In summary :<\/p>\n\n<ul class=\"wp-block-list\">\n<li>the 3D model &#8211; the <strong><span style=\"text-decoration: underline;\">wire<\/span><\/strong>,<\/li>\n\n\n\n<li>the data &#8211; the <strong><span style=\"text-decoration: underline;\">electricity<\/span><\/strong>,<\/li>\n\n\n\n<li>the apps and software &#8211; the washing machine, the TV that <strong><span style=\"text-decoration: underline;\">makes sense<\/span><\/strong> of it all.<\/li>\n<\/ul>\n\n<p>And it&#8217;s OK. Let&#8217;s accept that any self-respecting architectural firm can build a 3D model &#8211; which is the <strong><span style=\"text-decoration: underline;\">wire<\/span><\/strong>.<\/p>\n\n<h2 class=\"wp-block-heading\">The question arises<\/h2>\n\n<p>How many can create a consistent data structure in the model? Which is <strong><span style=\"text-decoration: underline;\">electricity<\/span><\/strong>.<br\/>And how many can connect an online CDE environment to the live model? And how many of them can connect it with operational software? Which makes <strong><span style=\"text-decoration: underline;\">sense<\/span><\/strong> of it all?<\/p>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-create-block-buildext-cover-block alignfull cover\" style=\"min-height:704px\"><div class=\"desktop\" style=\"background-image:url(https:\/\/buildext.com\/wp-content\/uploads\/2022\/05\/synlab-exploded-02-scaled.jpg)\"><\/div><div class=\"mobile\" style=\"background-image:url(https:\/\/buildext.com\/wp-content\/uploads\/2022\/08\/synlab-exploded-mobile-scaled.jpg)\"><\/div><div class=\"inner-container\">\n<div class=\"wp-block-group alignwide offset-text-left is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"has-white-color has-black-background-color has-text-color has-background has-large-font-size\"><strong>The 3D model is not the goal of BIM.<\/strong><br\/><strong>It is the basis.<\/strong><\/p>\n<\/div>\n<\/div><\/div>\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Advice to take<\/h2>\n\n<p>When two design firms tell you they are working in BIM, ask them to quickly show you what <a href=\"https:\/\/buildext.com\/en\/project-management\/#dalux\" target=\"_blank\" rel=\"noreferrer noopener\">project platform<\/a> they use on their design model on any of their current projects &#8211; which they have used to track changes during construction &#8211; and then show you what <a href=\"https:\/\/buildext.com\/en\/bim-services\/#FMsupport\" target=\"_blank\" rel=\"noreferrer noopener\">FM software integration<\/a> they have implemented during the operational period.<\/p>\n\n<p>If you can do it within 10 minutes, you&#8217;re in the right place.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1380\" height=\"776\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/11\/BIM-aram.jpg\" alt=\"\" class=\"wp-image-9425\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2022\/11\/BIM-aram.jpg 1380w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/11\/BIM-aram-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2022\/11\/BIM-aram-768x432.jpg 768w\" sizes=\"(max-width: 1380px) 100vw, 1380px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>In this, it is absolutely like the power line. Externally they look exactly the same, but the feel is quite different.<\/p>\n","protected":false},"author":3,"featured_media":9408,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[50],"tags":[193,46,198,359,357,358,181,80],"class_list":["post-9428","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-approach","tag-bim-en","tag-cde-en","tag-dalux-en","tag-data","tag-electricity","tag-investment","tag-paradigm-shift"],"_links":{"self":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/posts\/9428","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/comments?post=9428"}],"version-history":[{"count":16,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/posts\/9428\/revisions"}],"predecessor-version":[{"id":9553,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/posts\/9428\/revisions\/9553"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media\/9408"}],"wp:attachment":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media?parent=9428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/categories?post=9428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/tags?post=9428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}