{"id":15630,"date":"2024-12-06T15:45:04","date_gmt":"2024-12-06T15:45:04","guid":{"rendered":"https:\/\/buildext.com\/office-building-condition-survey\/"},"modified":"2025-02-18T12:20:48","modified_gmt":"2025-02-18T12:20:48","slug":"office-building-condition-survey","status":"publish","type":"post","link":"https:\/\/buildext.com\/en\/office-building-condition-survey\/","title":{"rendered":"It&#8217;s worth it &#8211; office building condition survey in 2024"},"content":{"rendered":"\n<p><strong>In the last few days we came across something that we didn&#8217;t want to pass by without saying something, and we ended up writing about it. We&#8217;re working on a building renovation project and we&#8217;ve reached the stage of a condition assessment. <\/strong><\/p>\n\n<p>Before we get into the specific case, let&#8217;s gather some facts about the condition survey itself in general.<\/p>\n\n<h2 class=\"wp-block-heading\"><strong>Traditional condition survey<\/strong><\/h2>\n\n<p>The aim of the office building condition survey is to eliminate problems and bring the project to completion with as little risk as possible.<\/p>\n\n<p>In typical, domestic practice, the appointed designer &#8211; or the technical inspector before construction &#8211; goes out into the field at the start of the design. He takes a notepad, a pen, perhaps a dictaphone, a camera and\/or a smartphone with good resolution images. Walk around, take pictures of the current condition from as many angles as possible and, if taking a condition survey at the start of construction, take a closer look at any visible defects.  <\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"534\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/muszaki-ellenor-hagyomanyos-felmeres-stock.jpg\" alt=\"\" class=\"wp-image-15546\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/muszaki-ellenor-hagyomanyos-felmeres-stock.jpg 800w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/muszaki-ellenor-hagyomanyos-felmeres-stock-300x200.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/muszaki-ellenor-hagyomanyos-felmeres-stock-768x513.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption class=\"wp-element-caption\">Office building condition survey for printed floor plan<\/figcaption><\/figure>\n\n<p>Meanwhile, he diligently notes on the pre-printed floor plan the current conditions &#8211; cracks in the drywalls, leaks, broken light bulb, rewired air conditioning control, etc. He also verbally consults the facility manager and tries to record everything carefully, verbatim, so that he doesn&#8217;t have to come out again. <\/p>\n\n<p>After the fieldwork, he returns to the office and processes the results of the survey: he takes a report, downloads the photos, marks what he found, in better cases he makes a floor plan with the approximate location of the shots based on his memory, finally saves the document in a stapled pdf and sends the whole package to the client by email. <\/p>\n\n<p>This survey, whether carried out at the beginning of the design or at the beginning of the construction, gives less accurate results and, on the basis of the images taken <\/p>\n\n<div class=\"wp-block-group alignwide offset-text-left is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"cover-mobile-p has-white-color has-black-background-color has-text-color has-background has-link-color has-large-font-size wp-elements-ab49300a752fbd3385eb0fa34d7ee6e7\"><strong>it&#8217;s almost certain that the very thing we need<\/strong><br\/><strong>won&#8217;t show up well.<\/strong> <\/p>\n<\/div>\n\n<p>In the best case, it comes out during the planning stage, in the worst case during construction that the built-in cupboard was there on the drawing, but a metre away, and the air duct was only on the as-built drawing, in reality who knows where it was routed.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"534\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/muszaki-ellenor-hagyomanyos-felmeres-desktop-stock.jpg\" alt=\"\" class=\"wp-image-15548\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/muszaki-ellenor-hagyomanyos-felmeres-desktop-stock.jpg 800w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/muszaki-ellenor-hagyomanyos-felmeres-desktop-stock-300x200.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/muszaki-ellenor-hagyomanyos-felmeres-desktop-stock-768x513.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption class=\"wp-element-caption\">The traditional survey involves a lot of manual work and potential for error<\/figcaption><\/figure>\n\n<p>It&#8217;s all about chasing problems that arise again and again, and getting ready for on-site solutions during construction. If a condition survey is carried out in the traditional way before construction, it is difficult to identify the exact location of the photographs and there is a good chance that the part where there has been no damage has not been photographed or has only been photographed in a distant, blurred view, so that at the end of the renovation it is useless to try to prove that the damage to the previously undamaged structure was caused by the contractor. <\/p>\n\n<p>But there is a simpler solution.<\/p>\n\n<h2 class=\"wp-block-heading\"><strong>The point cloud survey<\/strong><\/h2>\n\n<p>With the point cloud, neither the client nor the designer need to go to the site for every question that arises, but can interpret the survey results and make decisions together in the virtual space during a one-to-one call.<\/p>\n\n<p>And how does that come here?<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"620\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/v17-irodahaz-budapest.webp\" alt=\"The V17 office building before the health check\" class=\"wp-image-15551\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/v17-irodahaz-budapest.webp 800w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/v17-irodahaz-budapest-300x233.webp 300w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/v17-irodahaz-budapest-768x595.webp 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n<p>From the picture you can already identify that this post was created as a result of a <strong>condition survey of the <a href=\"https:\/\/www.google.com\/maps\/@47.519618,19.0611914,3a,75y,63.27h,108.72t\/data=!3m7!1e1!3m5!1sop9Vd7snGFj-QDWZT1irNw!2e0!6shttps:%2F%2Fstreetviewpixels-pa.googleapis.com%2Fv1%2Fthumbnail%3Fcb_client%3Dmaps_sv.tactile%26w%3D900%26h%3D600%26pitch%3D-18.71917503344619%26panoid%3Dop9Vd7snGFj-QDWZT1irNw%26yaw%3D63.27283775028515!7i16384!8i8192?entry=ttu&amp;g_ep=EgoyMDI0MTExMC4wIKXMDSoASAFQAw%3D%3D\" data-type=\"link\" data-id=\"https:\/\/www.google.com\/maps\/@47.519618,19.0611914,3a,75y,63.27h,108.72t\/data=!3m7!1e1!3m5!1sop9Vd7snGFj-QDWZT1irNw!2e0!6shttps:%2F%2Fstreetviewpixels-pa.googleapis.com%2Fv1%2Fthumbnail%3Fcb_client%3Dmaps_sv.tactile%26w%3D900%26h%3D600%26pitch%3D-18.71917503344619%26panoid%3Dop9Vd7snGFj-QDWZT1irNw%26yaw%3D63.27283775028515!7i16384!8i8192?entry=ttu&amp;g_ep=EgoyMDI0MTExMC4wIKXMDSoASAFQAw%3D%3D\" target=\"_blank\" rel=\"noreferrer noopener\">V17 building<\/a><\/strong> at 17 V\u00e1ci \u00fat, Budapest (source: kiadoiroda.hu). <\/p>\n\n<p>Our task was to completely redesign the interior of the seven-storey building to meet the needs of six different tenants belonging to the Granite Group, covering a total area of approximately 10 000 square metres. <\/p>\n\n<p>Obviously we need a lot of information for this, so we made an appointment with the client for a relatively quick and thorough survey.<\/p>\n\n<p>It was clear from the start of the project that we would not follow the traditional methodology, but would digitize wherever possible. What does it mean?<\/p>\n\n<p><strong>The first striking difference <\/strong>is that we started the design by laser scanning the building. We captured the current state of the building to the nearest millimetre, together with automatically generated 3D colour images in a point cloud of billions of points, so we&#8217;re sure to have all the information we need to design a true-to-life representation. This survey can be relied on at the end of the project, when the handover takes place, and will certainly provide all the details you need.  <\/p>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\"> https:\/\/youtu.be\/woj-ifTSrBw <\/div><figcaption class=\"wp-element-caption\">3D walk-through point cloud model of the V17 office building<\/figcaption><\/figure>\n\n<p><strong>The second significant difference<\/strong> is that our technical inspector did not take notes and photographs during the site survey, but displayed the previous 2D drawing of the building in Dalux on site and immediately added the defects he found.<\/p>\n\n<p>This immediately put the entries in a digital environment, in a clearly identifiable place at the ground level, which was then linked to the point cloud and the model that was updated during construction.<\/p>\n\n<p>The point cloud with the defects and the images were then uploaded to Dalux and made available to the client and the contractor. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1920\" height=\"1082\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2023\/09\/dalox-on-tablet-1920x1082.jpg\" alt=\"The latest floor plans are accessible on-site at any time.\" class=\"wp-image-11983\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2023\/09\/dalox-on-tablet-1920x1082.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/09\/dalox-on-tablet-300x169.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/09\/dalox-on-tablet-768x433.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/09\/dalox-on-tablet-1536x866.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2023\/09\/dalox-on-tablet-2048x1154.jpg 2048w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><figcaption class=\"wp-element-caption\">The latest floor plans are accessible on-site at any time.<\/figcaption><\/figure>\n\n<p>What happened?<\/p>\n\n<p>All the photos, drawings, notes, etc. immediately have been assigned to the model, without any misunderstandings or errors, clear and unambiguous, with all the necessary information and all the necessary documents, and everything in digital form.<\/p>\n\n<p>And so the <strong>third, very positive difference<\/strong> was born: <\/p>\n\n<div class=\"wp-block-group alignwide offset-text-left has-large-font-size is-layout-constrained wp-block-group-is-layout-constrained\">\n<p class=\"cover-mobile-p has-white-color has-black-background-color has-text-color has-background has-link-color has-large-font-size wp-elements-ae7df1ef7e12a3dbc658ea076c1e60a7\">the client first verbally indicated that this kind of cooperation was working so well in a novel way that he would like to share it on a forum, and then wrote (translated): &#8220;Hi Csaba, I was thinking about putting a &#8220;point cloud&#8221; article on Linkedin. Can you export the image 2 below, where V17 is shown with a point cloud on the outside, into some kind of meaningful format?&#8221;<\/p>\n<\/div>\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img decoding=\"async\" width=\"1920\" height=\"267\" src=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/V17-granit-poszt-1920x267.jpg\" alt=\"\" class=\"wp-image-15557\" style=\"width:672px;height:auto\" srcset=\"https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/V17-granit-poszt-1920x267.jpg 1920w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/V17-granit-poszt-300x42.jpg 300w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/V17-granit-poszt-768x107.jpg 768w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/V17-granit-poszt-1536x213.jpg 1536w, https:\/\/buildext.com\/wp-content\/uploads\/2024\/11\/V17-granit-poszt-2048x285.jpg 2048w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n\n<p>And that is what change would be impossible without: it is not enough to want and apply a modern solution from the service provider side, but also to have an innovative and inclusive client like <a href=\"https:\/\/granitalapkezelo.hu\/\" target=\"_blank\" rel=\"noopener\">Granite Fund Management<\/a>, who is willing to take meaningful steps to ensure that its current project is of high quality and low risk.<\/p>\n\n<div class=\"wp-block-group has-background is-layout-constrained wp-block-group-is-layout-constrained\" style=\"border-width:1px;background-color:#f9f9f9\">\n<p>\u261b If you are interested in how the construction industry is digitizing and how BIM was created, <a href=\"https:\/\/buildext.com\/en\/origin-of-bim\/\" data-type=\"post\" data-id=\"14354\">click here<\/a>.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>In the last few days we came across something that we didn&#8217;t want to pass by without saying something, and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":15554,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[50,51],"tags":[47,71,255,75,74],"class_list":["post-15630","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-case-studies","tag-digitalization","tag-laserscan-en","tag-point-cloud","tag-scan-en","tag-scan-to-bim-en"],"_links":{"self":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/posts\/15630","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/comments?post=15630"}],"version-history":[{"count":5,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/posts\/15630\/revisions"}],"predecessor-version":[{"id":15918,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/posts\/15630\/revisions\/15918"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media\/15554"}],"wp:attachment":[{"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/media?parent=15630"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/categories?post=15630"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buildext.com\/en\/wp-json\/wp\/v2\/tags?post=15630"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}